Natural Stone - Granite and Marble, Countertops and Vanity Tops

Home
Kitchens
Bathrooms
Tiles
Other
Stones
Edge Selection
3D Showroom
About us
Compare Us
Order Process

 • Order Process

2005-06-30

  1. Free Quote
    • Visit one of our locations (Ridgefield Park, NJ, South Plainfield, NJ, or Stroudsburg, PA).
    • Bring with you sample of your cabinet and tile that will help you pick the stone of your choice.
    • Bring layout of your project -kitchen countertop, bathroom vanity, Jacuzzi or fireplace surround.
    • Estimate will be based on layout and dimensions, stone type, edge selected, number and type of sinks.
    • During your visit to our showroom we will show you our unparallel selection of granite, marble, travertine, limestone, and other natural stones in full slabs.
    • We will provide you with samples of granite and marble to take home to make your selection easier.
    • You can also fax over a layout or email us using our contact form with layout and measurements of your project.
    • Please provide us with the following information regarding your project:
      • Layout and measurements
      • Stone name(s) ( if known)
      • Edge name(s) ( if known)
      • Personal information including the installation address, contact information, and any other details that will help us determine the quote of the job. (click here for drawing example and estimate form)
        * All estimates are based on the dimensions provided to us


  2. Before you place an order with our company, please check the following requirements:
    • All cabinets need to be installed.
    • All of the appliances (faucets, sinks, stove, dishwashers, fridge, etc.) need to be on location (sinks will be taken to use them as a template for cutouts).
    • Preexisting countertop must be removed. We do not remove old countertops nor specialize in plumbing or electricity.
    • Existing sink and cook top must be detached before we come for template.
    • You must meet all of the above requirements in order to call us for template. Once order is placed, we will come for template the very next day!
    • On the job site our installers will answer all your questions and provide you with any technical information that may help you to make final decision about your project.
    • We require a 50 % deposit based on the estimate price after the template (Forms of deposit payment: personal check, certified check, cash - we do not accept credit cards!).


  3. The final price for the project will be based on the measurements taken on the job. Since your project is made out of natural stone, some materials may not be consistent in structure and veins; we would like you to come down to our yard so that we can show you the material and which area will be used for the project surface. At this point we will need your final OK to fabricate the project. It takes us from 2 to 4 business days to fabricate and install the project after the confirmation of the final price.

  4. Installation is the last step of the entire process. This includes installation of countertop, sinks attachment to the stone, seams (if necessary), and holes for faucets. Final payment is required on the day of the installation (Forms of final payment: certified check or cash only - we do not accept personal check on installation!).
• Go Back       • Read Remaining Articles       • Read Articles Archive
Iberia - Vanuatu Accommodation - Wilton carpets - Kinder Gas - Family Dental Care In La Puente